8 Jul 2016 12:56

Stroytransgaz building second Power of Siberia pipeline section for 27.2 bln rubles

MOSCOW. July 8 (Interfax) - Stroytransgaz (STG) is building the 93-km second section of the Power of Siberia gas pipeline for 27.219 billion rubles, Gazprom said in materials.

The second section runs from Lensk, which is 207.7 km into the pipeline, to the Saldykelskaya-1 compressor station, which is 301.1 km along the route.

Stroytransgaz is also building first section of the pipeline, from Chayanda to Lensk, in a contract with 46.5 billion rubles.